Kitchen and bathroom remodeling in the Sioux Falls area · Licensed, bonded & insured · License #14544
Ready Service Solutions logo
Remodeled white kitchen with quartz peninsula
Guide · Published October 4, 2026

What a Kitchen Remodel Costs in Sioux Falls

What drives the price of a kitchen remodel in Sioux Falls, our starting prices, and how to set a budget before you ask for a bid.

5.0 from 18 Google reviewsRead them on Google

Request your estimate

No-cost estimate. We reach out by phone or text to talk through your project.

Have photos? Add photos and project details

By the Ready Service Solutions team, licensed residential building contractor in Sioux Falls, SD. Published October 4, 2026.

The short answer

Our full kitchen remodels start at $20,000. A tile backsplash on its own starts at $1,500 for subway tile and $2,500 for large-format tile. Where your project lands above those starting points depends on a handful of decisions, and most of them are yours to make.

Every kitchen is bid individually after we see the space. The numbers here are starting points so you can decide whether a remodel fits your budget before anyone comes out to measure.

What moves the price most

Cabinets are usually the largest single line in a kitchen budget. Stock, semi-custom and fully custom cabinets differ widely in price, and the number of boxes matters as much as the door style.

Layout changes come next. Keeping the sink, range and refrigerator where they are keeps plumbing, gas and electrical work small. Moving them, or removing a wall and adding a support beam, adds structural work, permits and time.

Countertop material, flooring that has to run under new cabinets, and the amount of tile all add up after that. Appliances are normally purchased separately by the homeowner.

Ways to control the budget

Keep the existing layout if it works. Spend on the things you touch every day, such as drawers, hardware and countertops, and save on things you do not. If you are supplying your own cabinets or materials, tell us up front. We install customer-supplied cabinets and materials and will bid the labor accordingly.

Decide your selections before work starts. Changes made after cabinets are ordered are the most common reason a kitchen goes over budget.

How long it takes

Most kitchen remodels take 2 to 6 weeks of on-site work, depending on scope. Cabinet and countertop lead times are separate from that and are often the longest part of the wait, so order early.

Paying for it

Financing is available through Wisetack for qualified customers, which lets you spread the cost into monthly payments. Ask about it when you request your bid.

Kitchen Remodeling cost in Sioux Falls

Kitchen remodelsStarting at $20,000
Subway tile backsplashStarting at $1,500
Large-format tile backsplashStarting at $2,500

Typical pricing as of 2026. Every project is different: your written bid is based on the size, materials and scope of your job.

Related: Kitchen Remodeling in Sioux Falls · Project gallery · Customer reviews

Kitchens and bathrooms are what we do best.

Cabinets, countertops, tile showers and flooring, run by one contractor.

Kitchen Remodel Services in Sioux Falls, SD

Ready Service Solutions handles complete kitchen remodels in Sioux Falls and the surrounding Tea area — cabinets, countertops, tile, flooring, and finish work under one contractor.

What to Expect from a Kitchen Remodel in Sioux Falls and Tea, SD

Homes in the Sioux Falls metro — including the fast-growing Tea corridor in Lincoln County — vary widely in layout and age. Older homes in established Sioux Falls neighborhoods often have galley kitchens built around 1950s–1970s floor plans, where the plumbing, electrical, and gas lines were not designed for modern appliance configurations. Moving any of those services requires permits from the City of Sioux Falls or Lincoln County, depending on your municipality, and any structural work such as removing a load-bearing wall to open a kitchen to a living space will require engineered drawings and inspections.

South Dakota's climate adds a practical layer: freeze-thaw cycles stress subfloors over time, and kitchens on exterior walls — common in ranch-style homes throughout the Tea and Harrisburg areas — can have insulation and vapor barrier conditions that need to be addressed before new flooring or cabinetry goes in. Catching those issues during demo rather than after cabinets are hung keeps the project on schedule.

Ready Service Solutions serves homeowners across Sioux Falls, Tea, Harrisburg, Brandon, and surrounding communities. Because we handle the full scope — demolition, rough-in coordination, cabinets, countertops, tile, and flooring — there is one point of contact for permit questions, material lead times, and scheduling.

What Drives the Cost of a Kitchen Remodel — Beyond the Starting Price

The starting figures on this page give you a floor, not a ceiling. Understanding the decisions that move a project up from that floor helps you scope the work before anyone comes out to measure.

Scope creep most often comes from three places: layout changes, material upgrades chosen after the project starts, and conditions found during demolition. Keeping your sink, range, and refrigerator in their existing positions limits plumbing and electrical work significantly. Choosing all your materials — cabinet line, countertop slab, tile, and flooring — before demolition begins means those items can be ordered with accurate lead times and the schedule holds. Selections made mid-project are the single most common reason a kitchen remodel takes longer and costs more than the original bid.

Material lead times in the current market vary by supplier and product. Semi-custom and fully custom cabinet lines typically run longer than stock. Countertop fabrication after a template is taken adds another window. Building those waits into your project timeline before work starts — rather than discovering them after demo is done — keeps your kitchen out of commission for the shortest possible stretch.

Common questions

Do I need a permit for a kitchen remodel in Sioux Falls or Tea, SD?
It depends on scope. Cosmetic updates — new cabinet fronts, countertops, paint, or flooring — generally do not require a permit. Work that touches structural elements, moves plumbing or gas lines, or adds or relocates electrical circuits does require permits from the City of Sioux Falls or Lincoln County. Ready Service Solutions handles permit coordination as part of full project oversight, so you are not managing that process separately.
How disruptive is a kitchen remodel, and can I stay in the house?
Most homeowners stay in the house during a remodel, though you will be without a functional kitchen for the bulk of the project. Demolition and rough-in phases are the noisiest and dustiest. Setting up a temporary kitchen — a microwave, mini-fridge, and electric skillet in another room — makes the stretch manageable. The on-site work phase for a full remodel typically runs several weeks, with the total timeline extended by cabinet and countertop lead times that happen before or alongside installation.
Can Ready Service Solutions install cabinets or materials I supply myself?
Yes. If you are sourcing your own cabinets, countertops, or tile, let us know when you request your estimate and we will bid the labor accordingly. Providing your own materials can affect the project timeline since delivery coordination and any damage claims become the homeowner's responsibility, but it is a common arrangement and we will walk through the logistics with you before work begins.

Get a Written Estimate for Your Kitchen Remodel

Tell us about your project — layout, scope, and any photos you have — and we will reach out to schedule a walkthrough.